if I have multiple provisions with individual bullet points, it won't let me start the numbered list over. For example, if article 1.2 has a 1. 2. 3. 4. section, and article 1.3 needs another 1. 2. 3. 4. section, it won't let me start from 1. It can only continue like 5. 6. 7. 8. I solved it by doing a dash instead but that is not how the contract was meant to look. Help?